V-Model: Case Study — A Failed Assessment Rebuilt: Closing 40 Traceability Findings in 12 Weeks
- Date
- 2027-01-14
- Location
- Online
- Host
- Zach L
About this event
A live 30-minute expert session on Case Study — A Failed Assessment Rebuilt: Closing 40 Traceability Findings in 12 Weeks (V-Model — The V-Model & Safety Lifecycle). What We'll Cover: How the project's V-model looked on paper versus the broken trace and verification reality the assessor found The recovery method step by step: finding triage, trace reconstruction, targeted re-verification, and re-assessment prep How each finding tied back to specific IEC 61508 / ISO 26262 clauses and the corrective evidence package produced Common root causes exposed: tool-hopping requirement history, verbal requirement changes, and tests traced to nothing The re-assessment evidence set and process fixes that prevented recurrence, as accepted by the assessor Related topics: case study · failed assessment ·