FMEA: Process FMEA (PFMEA) and the Control Plan — Getting the Linkage Right
- Date
- 2027-03-11
- Location
- Online
- Host
- Zach L
About this event
A live 30-minute expert session on Process FMEA (PFMEA) and the Control Plan — Getting the Linkage Right (FMEA · HARA — Hazard & Failure Analysis). What We'll Cover: What PFMEA is and where it sits between process flow diagram and control plan in the APQP chain Step by step: process structure tree, 4M cause analysis, and assigning prevention vs detection controls per station How each PFMEA line must reconcile with control plan rows, reaction plans and operator instructions Common mistakes: PFMEA and control plan maintained by different owners and drifting apart The PFD-PFMEA-control plan consistency check auditors run line by line in IATF and VDA 6.3 audits Related topics: pfmea · process fmea · control plan · process flow diagram · 4m analysis · man machine material method · detection con