ISO 12100: Risk Assessment of Assembled Lines and Partly Completed Machinery
- Date
- 2027-02-15
- Location
- Online
- Host
- Zach L
About this event
A live 30-minute expert session on Risk Assessment of Assembled Lines and Partly Completed Machinery (ISO 12100 — Machinery Risk Assessment). What We'll Cover: What counts as an assembly of machinery versus independent machines and why the line integrator must run an overall ISO 12100 assessment Step-by-step: interface hazard identification between machines, common control and e-stop zoning, material flow and access between cells How supplier declarations of incorporation and assembly instructions map into the line-level ISO 12100 record and technical file Common mistakes: relying on each machine's CE mark to cover the line, unassessed conveyor interfaces, no single risk owner for the assembly The line-level risk assessment, interface matrix and declaration set an auditor expects from the