ISO 10218: Commissioning and Handover of Robot Systems
- Date
- 2028-06-17
- Host
- ISO 10218 (Functional Safety)
About this event
Commissioning and handover are where a robot system stops being a project plan and starts becoming a real operational asset. This meetup focuses on that critical stretch of work: getting a system safely validated, documented, accepted, and ready for the people who will actually use and maintain it. If you work with industrial robotics, you already know that the hardest problems often show up at the end. ISO 10218 gives structure to those final steps, and this event is built to help you discuss what that looks like in practice with people who care about doing it well. About the Event This is an in-person robotics meetup centered on ISO 10218 and the practical realities of commissioning and handover of robot systems. The focus is not just on reading a standard, but on understanding how its e
Who should attend
If your work touches the final stages of deploying robot systems, you will likely find this highly relevant. - You are a **robotics engineer, controls engineer, or automation engineer** who wants a stronger grasp of what successful commissioning and handover should include. - You work for a **system integrator or OEM** and need to think carefully about validation, documentation, acceptance, and how to deliver a system that is truly ready for customer use. - You are on the **manufacturing, operations, or plant side** and want to know what to ask for before taking ownership of a robot cell or automated system. - You support **safety, compliance, or risk management** and want more practical discussion around how ISO 10218 connects to real commissioning decisions. - You are part of **maintenance, service, or technical support** and care about the quality of handover because it directly affects uptime, troubleshooting, and long-term support. - You are active in the **robotics community** and want informed, practical conversation with people who have firsthand experience getting systems over the line from installation to operational readiness.