🟠 Fixing the Grid Interconnection Queue: How distributed compute can accelerate grid infrastructure

Date
2024-09-17
Host
The Drop 2024 Ripples
Register

About this event

This event is organized by The Drop 2024 Ripples on 2024-09-17. Topics covered include: other, infrastructure, manufacturing, community, networking.

Speakers

Topics